Interior
Kitchen remodeling
A kitchen in Lexington or Columbia typically runs four to eight weeks. We are based in Pelion. Cabinets, floors, and trim are the same crew from demo to done. You get a written estimate after we see the room — not a price from a picture of a cabinet you liked.

The kitchens in our photographs are jobs we finished: one with white cabinets and butcher block, one with a black range hood and an island, one with teal cabinets and LVP running into the living room. They are examples of work, not a menu, and not a Lexington or Columbia address. Your layout, what is behind the drywall, and whether the floor is level are why we have to stand in the room. The crew is based in Pelion.
What a kitchen remodel involves
Demo of what is coming out, then cabinets, counters, the floor, and the trim that makes the room finished. Flooring we install includes hardwood, LVP, and tile. Cabinets and trim are the same crew, not a handoff to three other companies. If the kitchen is really an addition, the framing and the roof tie-in are part of that scope. Paint is available as the last trade or on its own. The product lines for your kitchen are named on the written estimate after we see the room.
Signs it is time
Cabinets that no longer close, a soft floor in front of the sink, a layout that makes the room a hallway, water staining under the dishwasher, or a remodel you have already decided to do and want one crew to finish. A tired finish by itself can be paint. A floor you can feel give is a different job. We say which after the visit.
What to expect
A kitchen we take on typically runs four to eight weeks. That is typical, not a promise. Call (803) 265-5645 or use the estimate form. We answer within one business day, come to the house, and send a free written estimate: scope, materials, and price. The schedule on your job is the one on that estimate, because a galley kitchen and a kitchen that needs the subfloor are not the same weeks.
Humidity in a Midlands kitchen
Summer humidity in Lexington and Richland counties shows up under sinks and along exterior walls, especially where a window sits over the counter. We look at those spots before we write the scope. Ventilation and what is behind the wet wall are part of the visit. We are not selling a brand of fan on this page. We are saying the room gets looked at in person, the same way a roof does.
Questions
- How long does a kitchen take?
- Typically 4–8 weeks. The schedule on your job is the one on the written estimate.
- What does the crew actually do?
- Cabinets, counters, floors, and trim, with the same crew from demo to done. Flooring can be hardwood, LVP, or tile. Paint can close the job.
- How do you design the kitchen?
- We scope the work in writing after we see the house. The layout, the materials, and the price are on that estimate.
- What does a kitchen remodel cost?
- Every kitchen is different. The free written estimate, after we see the room, is the price: scope, materials, and the number.
- Can the same crew do the roof?
- Yes. Ole South does the roof and the remodel. One company, Pelion, (803) 265-5645.
- Are the photos a package I can order?
- No. They are kitchens we finished. Your estimate describes your house.
Monday–Saturday 7:00 AM–5:00 PM. We answer within one business day. Emergency roofing after hours uses the same number.
