Ole South Roofing & Construction

Interior

Bathroom remodeling

A bathroom in Lexington or Columbia typically runs two to four weeks. We are based in Pelion. We do the tile, the vanity, the surround, and the trim with the same crew. The estimate is written after we see the room.

Finished bathroom with a double vanity, quartz top, and new lighting
A bath we finished.

The photographs are a double vanity we finished and a marble walk-in shower — glass, bench, window, hex-tile pan — from our jobs. They show work we have done, not a street in Lexington or Columbia. The materials on your bath are the ones named on the written estimate after we see the room, not a package copied from the picture. The crew is based in Pelion.

What a bath remodel involves

Tile, the vanity, the surround, and the trim, with the same crew. A tub-to-shower change, a new vanity in a room that stays the same size, and a gutted hall bath with a soft subfloor are different scopes. Flooring in a bath is often tile. If the bath is part of a larger interior, start at interior remodeling. Paint at the end can be ours, on the painting page.

Signs the bath needs more than caulk

A floor that feels soft, caulk that has failed and stained the ceiling below, a window rotting in the wet wall, a surround that flexes, or a fan that does not clear the mirror after a shower. Recaulking a sound joint is maintenance. A soft floor is a remodel. We say which after we are in the room.

What to expect

Two to four weeks is typical. A powder room and a gutted hall bath are not the same schedule, which is why the weeks live on the estimate. Call (803) 265-5645. We answer within one business day, Monday through Saturday, 7 to 5, walk the bath, and send a free written estimate: scope, materials, and price. George Boulware leads the building. He has been remodeling South Carolina homes for over fifty years.

Humidity in a closed bathroom

Midlands humidity does not stop at the door. A bath that stays wet grows problems at the window, the pan, and the ceiling below. We look at ventilation and at what the water has already done. That look is part of the visit. The estimate says what we are actually going to replace.

Questions

How long is a bath remodel?
Typically 2–4 weeks. The schedule on your job is the one on the written estimate.
Do you do tile showers?
Yes. Tile is part of the interior work, including the walk-in showers in our photographs. Your materials are named on the estimate.
What does a bathroom remodel cost?
Every bath is different. The written estimate after we see the room lists the scope, the materials, and the price.
What are signs the floor is failing?
A soft spot, a stain on the ceiling below, or a surround that moves. We confirm it in person before we write the scope.
Do you also replace the roof?
Yes. Same company, Pelion, (803) 265-5645. Roofing and the remodel are one crew.
Is the marble shower the standard package?
No. It is a shower we finished. The estimate describes your bath.
Call (803) 265-5645 Free written estimate

Monday–Saturday 7:00 AM–5:00 PM. We answer within one business day. Emergency roofing after hours uses the same number.